BizForce360 for Production.
Production in BizForce360 starts from real demand and ends in the ledger: material is issued against a production order, received as finished goods with batch and cost, and inspected before it ships. Planning, purchasing and the shop floor work from the same stock.
BOM, MRP, jobs, quality and the true cost of every batch.
- Bill of materials
- MRP 360
- Job work
- Batch cost
The modules a production business actually runs.
Grouped the way the work happens, not the way the menu is laid out — every one of these is a live screen in the product.
Plan and engineer
6What to make, from what, with which capacity.
- Bill of Materials
- Production Plan
- Production Orders
- Production Workflows
- Resource Overview
- Resource Planning
Plan the material
6Turn demand into buy-or-make suggestions before the shortage appears.
- MRP Overview
- MRP 360 View
- Requirements Plan
- Planned Orders
- Item Planning
- MRP Settings
Run the floor
7Jobs, issues, receipts and work sent outside.
- Production Jobs
- Production Jobs Board
- Production Receive
- Job Work
- Job Work Challans
- Material Requests
- Goods Issue
Control quality and cost
6Inspection at the right stage, and a cost per unit you can explain.
- Quality Control
- QC Inspections
- Batches
- Item Revaluation
- Stock Taking
- Landed Cost
The loop, step by step.
- 01
Demand
Sales orders and forecasts become gross requirements across the planning horizon.
- 02
Net requirements
MRP nets off stock, open supply and safety stock and proposes what to buy and what to make.
- 03
Issue
Material requests are approved and issued to the production order, so consumption is recorded where it happened.
- 04
Produce and inspect
Jobs run through their workflow; QC records the result and accepted quantity before receipt.
- 05
Receive and cost
Finished goods enter stock with the batch, its cost and the variance against the BOM.
Where the money leaks today.
Shortage found late
MRP nets demand against stock and open supply, so missing material shows up days before the line stops, not on the morning of the run.
Yield nobody measured
Issue is against an order and receipt is against the same order, so consumption versus BOM is a report rather than an estimate.
Material with job workers
Challans keep a running balance of what is outside, how long it has been there, and what came back short.
What production teams ask first.
Make to stock or make to order?
Both. Orders can be driven by stock levels or by a specific sales order, and the BOM plus routing decide the components either way.
How is a batch costed?
From the issued material, added landed and processing cost, and the received quantity — so the variance against the BOM is visible per batch.
Can we outsource part of production?
Yes. Job work tracks material sent out, the charges, the expected return date and the reconciliation.
Other industries and the full catalogue.
BizForce360 for FMCG & Distribution
Beats, secondary sales and dealer stock — measured on the same day.
BizForce360 for Paint & Construction Materials
Dealer network plus painter and site demand, in one thread.
BizForce360 for Agro & Food Processing
Batch, expiry and quality control from procurement to dispatch.
All modules
The full catalogue by area, with search.
All industries
The complete list of industry pages.
See it running with production data.
Open the demo business closest to your operation, or ask us for a walkthrough built around how your business actually runs.
